Portfolio
Bearings assembly – metallic Hall

Topo-geodetic works in order to position bearings elements. Used equipment: Trimble S8 total station and digital level Trimble Dini03. Ground constructed area of the metall Hall is – 1100 sqm,  total number of perimeter poles 2